BUYER GUIDE
How to Compare Custom Bag Quotations
Two quotations can show different unit prices because they do not cover the same product or commercial scope. A useful comparison first normalizes what is included, excluded and still unconfirmed.
Turn assumptions into written decisions
Begin with one controlled product brief, then compare every supplier response against the same construction, quantity and approval requirements. Do not fill gaps with assumptions; mark them for written confirmation.
Confirm that the product scope is identical
Compare finished dimensions, material construction, lining, closure, reinforcement, decoration and color requirements line by line. Small construction differences can create a different product.
Record the quoted quantity and whether material or color availability affects the proposed scope.
Separate development and production costs
Identify sample charges, artwork or setup work, molds or tooling, revisions and courier costs separately from production pricing.
Ask which development items can be reused for repeat orders and what would trigger a new charge.
Compare inspection, testing and packing
List any buyer-required testing, inspection level, retained samples, labels, retail packaging, inner protection, assortments and export cartons.
If an item is not included, record who will arrange it and when its cost or specification will be confirmed.
Check trade terms, validity and exclusions
Record the quoted currency, trade term, destination point, payment milestones, quotation validity and assumptions about duties, freight or local charges.
Confirm lead-time starting points and exclusions in writing before treating quotations as commercially comparable.
BUYER FAQ
Questions to settle before approval.
Why should buyers avoid comparing only unit prices?
Unit prices can cover different materials, construction, quantities, sample work, testing, packaging and delivery responsibilities.
What should remain marked as unconfirmed?
Any material, color, test, packaging, freight, tooling or approval item that the supplier has not expressly included or excluded.
Should a quotation include a fixed production time?
The schedule should state its starting point and assumptions. Final timing depends on confirmed materials, approvals, quantity, testing and production planning.